← All Chrome listings

Chrome

Change Order Capture Assistant

by stackforge more by this developer →

Users
4
-1 (7d)
Rating
unrated
Version
0.1.0
Last updated 04/29/2026
Size
129 KB

#222,336 of 263,655 by installs on Chrome · #138,468 of 162,012 in productivity

First seen by this census 09/01/2026 — the store does not publish a creation date

Last updated 04/29/2026

Tracked since 09/01/2026

View in the Chrome store ↗

Compare with another extension

Category: productivity / workflow

Languages: English (United States)

Description

Detect likely change-order requests in Gmail and turn them into structured solo drafts.

Alternatives to Change Order Capture Assistant

Growth

Change in installs. This store publishes the count rounded to one or two significant figures, so it does not move when the listing grows - it moves when the rounding rolls over. The figures below are therefore what was actually observed between the two crawls named in "measured over", not scaled to the window, and the percentage is of that same rounding step - so a small listing crossing a bucket shows a very large one. A window needs a full period of history before it reports anything.

Per Growth Growth % Actual change Measured over
day Not enough history yet
week -1 -1 10.7 days
month Not enough history yet
year Not enough history yet

History

Users

09/04/2026 · 4 09/18/2026 · 4

Permissions

Access level: Limited — Some access to your activity or data, or to specific websites.

  • Reads and changes your data on specific sites

Manifest V3

Reads and changes your data on specific sites